Water Network Infrastructure
Status:  Closed
Taken Jobs:  4
  North Lebanon, Lebanon
Project Description
Design and supervision of the extension, rehabilitation, and upgrade of existing water supply systems for 2 municipalities.
The project is part of a program that will provide reliable access to water to Syrian refugees and Lebanese host communities through the improvement of existing water infrastructures, including drilling or upgrading of existing boreholes, rehabilitation and extension of networks, increasing of water storage capacity, and reduction of water losses in the network. The target population will be provided with a reliable potable water service, thus improving the relation with the North Lebanon Water Establishment (subscription, payment of fees, etc.). Furthermore, the water expenditure in the target population will decrease, as the public service will fulfill all of the daily water needs (drinking and domestic use), reducing dependence from alternative sources and private suppliers.

Timeline:
30 days preliminary design
20 days client review and approval
30 days final design
20 days client review and approval
15 days tender documents
Afterwards, supervision phase

NOTE: THIS PROJECT IS STILL IN THE PROPOSAL STAGE (WE ARE RESPONDING TO THE RFP), AND WE ARE LOOKING FOR CANDIDATES WHO ARE WILLING TO WORK ON THE PROJECT, IN ADDITION TO WORKING ON THE PREPARATION OF THE PROPOSAL WITH OUR TEAM, WHICH IS TO BE SUBMITTED BEFORE SEPTEMBER 15, 2017.
Jobs Added for This Project
Hired
Mohamad Chalabi
Deadline for Proposals:
08 - Sep - 2017
Budget:
$5000
Planning Engineer
Needed Only during Supervision. the PE is to keep track of the progress, and update the primavera (or MS) works schedule to report to the client.
The PE will not be utilized on a full time basis on the job, and can work remotely.
Total submissions: (4)
Field of Expertise
Project Planning
Civil Public Works
Software: Microsoft Project -- Primavera
Hired
Jad Jaroudi
Deadline for Proposals:
01 - Sep - 2017
Budget:
$5000
Potable water network engineer
Preferable if you have experience working on similar infrastructure projects.
Scope (more information will be provided upon selection):
You are requested to work on the design stages of this project (approximately 4-6 months), and be available for periodic supervision of the site if needed.

Please submit your interest in the project, with an initial bid price. We will discuss your quotation and prices and the scope of work in the next stage if you are shortlisted. Please attach your CV.
Total submissions: (3)
Field of Expertise
Water Infrastructure Engineering
Wet Infrastructure Engineering
Potable Water Supply Systems
Services: Detailed Design -- Report Writing -- Schematic Design -- Specifications
Hired
Joelle Saade
Deadline for Proposals:
30 - Aug - 2017
Quantity Surveyor
The quantity surveyor will be required to prepare the BOQ for tender submissions of contractors, after the design phase is completed. It will be an involvement of approximately 1 to 1.5 months where coordination with the design team will be needed.
Total submissions: (5)
Field of Expertise
Quantity Surveying
Electrical -- Mechanical
Deadline for Proposals:
30 - Aug - 2017
Budget:
$30000
Construction Manager (Supervision Role)
Supervisory role construction manager job. Must have at least 10 years of experience in similar projects.
The job will be part time and will generally take up 2-3 days of the week on site.
The quoted price is for the entire project duration (18 months).
The construction manager will manage the site supervisor's work.
Total submissions: (5)
Field of Expertise
Contracting & Site Management
Civil -- Electro-mechanical -- Public Works
Hired
Charbel Hebbo
Deadline for Proposals:
28 - Aug - 2017
Budget:
$5000
Mechanical Engineer
Preferable if you have experience working on similar infrastructure projects.
Scope (more information will be provided upon selection):
- Assess the status of all the civil structures and equipment (pump, generators – n. of working hours-, electrical board, main transmission, reservoirs, valves, automatic control of water level in the aquifer and in the reservoirs, chlorination equipment) to estimate the life of the parts and the need repairs or upgrades. Any equipment, relevant for the operation of the system, which is found out of use, must be reported and the reasons described.
- You are requested to work on the design stages of this project (approximately 4-6 months), and be available for periodic supervision of the site if needed.

Please submit your interest in the project, with an initial bid price. We will discuss your quotation and prices and the scope of work in the next stage if you are shortlisted. Please attach your CV.
Total submissions: (6)
Field of Expertise
Water Infrastructure Engineering
Wet Infrastructure Engineering
Potable Water Supply Systems
Services: Bill Of Quantities -- Design Review -- Detailed Design -- Report Writing -- Schematic Design -- Specifications
Deadline for Proposals:
28 - Aug - 2017
Budget:
$5000
Electrical Engineer
Preferable if you have experience working on similar infrastructure projects.

Scope (more information will be provided upon selection):
- Assess the status of all the civil structures and equipment (pump, generators – n. of working hours-, electrical board, main transmission, reservoirs, valves, automatic control of water level in the aquifer and in the reservoirs, chlorination equipment) to estimate the life of the parts and the need repairs or upgrades. Any equipment, relevant for the operation of the system, which is found out of use, must be reported and the reasons described.
- Assess the status of the electricity supply and study the possibility of renewable power generation systems for existing and new pumping stations

You are requested to work on the design stages of this project (approximately 4-6 months), and be available for periodic supervision of the site if needed.

Please submit your interest in the project, with a bid price (if something is unclear we can discuss it). We will discuss your quotation and prices and the scope of work in the next stage if you are shortlisted. Please attach your CV.
Total submissions: (6)
Field of Expertise
Electrical Utilities
Substations -- Power Generation
Services: Bill Of Quantities -- Design Review -- Detailed Design -- Modelling / Calculations / Analysis -- Report Writing -- Schematic Design -- Specifications
Deadline for Proposals:
28 - Aug - 2017
Budget:
$10000
Hydrogeologist
If you are a hydrogeologist, please submit your interest in the project, without adding a bid price in your form. We will discuss your quotation and the scope of work in the next stage if you are shortlisted. Please attach your CV.
Total submissions: (1)
Field of Expertise
Water Infrastructure Engineering
Water Resources Engineering
Hydrology And Hydro Geology
Deadline for Proposals:
28 - Aug - 2017
Site Supervisor
This is a commitment for about a year and a half, but this might change depending on construction progress. The candidate needs to have relevant construction supervision experience on similar infrastructure projects.
Total submissions: (10)
Field of Expertise
Contracting & Site Management
Civil -- Public Works